Professional Schedules

Professional Schedules STANDATA Variance 19-BVC-024

This variance recognizes the attached schedules of professional involvement as an alternative solution to the requirements in Articles 2.4.3.1, 2.4.3.2. and 2.4.4.1. of Division C of the National Building Code – 2019 Alberta Edition (NBC(AE)).

The schedules of professional involvement were first introduced in the 1997 Edition of the Alberta Building Code (ABC 1997) at the request of the Alberta Association of Architects (AAA) and the Association of Professional Engineers and Geoscientists of Alberta (APEGA). Only minor revisions have been made to the schedules of professional involvement since their introduction 1997.

The requirements for the schedules of professional involvement are contained in Articles 2.4.3.1., 2.4.3.2. and 2.4.4.1. of Division C of the NBC(AE) and the schedules of professional involvement are provided in Appendix B of the NBC(AE).

AAA and APEGA reviewed the schedules of professional involvement in the NBC(AE) and provided Municipal Affairs with revised schedules of professional involvement for use in the Alberta safety codes system. The revised schedules of professional involvement contain major changes to the content, including a different process from what is required by Section 2.4. of Division C of the NBC(AE).

AAA and APEGA also created a helpful user guide which can be downloaded from APEGA’s website here.

STANDATA Variance 19-BVC-024 (Includes Schedules A, B, C-1, C-2, and C-3.)

NBC 2019 AE Schedule A STANDATA
NBC 2019 AE Schedule B STANDATA
NBC 2019 AE Schedule C1 STANDATA
NBC 2019 AE Schedule C2 STANDATA
NBC 2019 AE Schedule C3 STANDATA

Professional Schedules for National Building Code – 2019 Alberta Edition​

The professional schedules, below, are referenced in the National Building Code – 2019 Alberta Edition. They are presented here in a fillable format for the user.

The reference includes energy efficiency requirements on the NECB 2017 and NBC-2019 AE Section 9.36.

Schedule A-1: Letter of Commitment by the Owner and Coordinating Registered Professional

Schedule A-2: Confirmation of Commitment by the Owner and Registered Professional of Record

Schedule B-1: Letter of Commitment by the Registered Professional of Record

Schedule B-2: Summary of Design and Field Review Requirements

Schedule C-1: Assurance of Compliance by the Coordinating Registered Professional

Schedule C-2: Assurance of Professional Field Review and Compliance