Appeal Decisions

Decisions of appeal tribunals can be referenced here.

Building Discipline


Building – Safety and Protection of Adjacent Properties – March 2022

Building – Adjacent Property Protection – December 2021

Building – Unsafe Condition – September 2021

Building – Demolition Order – August 2019

Building – Change of Use – June 2019

Building – Change of Occupancy – September 2019

Building – Bedroom Windows – October 2019

Building – Feasibility to bring a building up to Code – December 2018.pdf

Building – Roof-top addition to a condominium building – July 2018 

Building – Backfill of open excavation – April 2018.pdf

Building – Egress requirements in the 2006 Alberta Building Code – January 2018.pdf

Building – Barrier free exit door – October 2017

Building – Structural alterations without the required permits – August 2017

Building – Change of the use of a single detached dwelling – November 2017

Building – Structural integrity of the building – December 2017

Building – Construction of a Greenhouse Structure Existing Without a Permit – March 2016

Building – The use of an aluminium panel system utilizing polyamide inserts – August 2016

Building – The construction of a Crane-way without the necessary building permit – September 2016

Building – Meeting the requirements of exposing building face – November 2016

Building – Installation of two glazed openings in an exposed buildingface – December 2016

Building – Second Storey Fire Resistance Rating and Base Building Classification January 2015

Building – Requirement to provide schedules of Professional Involvement June 2015

Building – Top of River Bank Property and Unsafe Condition October 2015

Building – Top of River Bank Property and Unsafe Condition 2nd site October 2015

Building – Provision of Water Supply for Firefighting Purpose October 2015

Building – 3 Existing Additions Without Permits on a Single-Family Residence June 2014

Building – Construction of a Retaining Structure Existing Without a Permit August 2014

Building – Permit Refusal Residential Occupancy Alternative Solution October 2014

Building – Exit Stairwell Door and Frame Assemblies and Compliance with ABC 2006 and NFP 80 December 2014

Building – Relocatable Industrial Accommodation April 2013

Building – Construction of Accessory Greenhouse Building on Single Family Dwelling June 2013

Building – Exterior Window Replacement October 2013

Building – Equestrian Centre Dry Hydrant November 2013

Building – Electromagnetic Locking Devices and Impeded Egress Zone December 2013

Building – Distance of Roof Soffits and the Exposing Building Face of a Detached Garage March 2012

Building – Ventilation Control and Fire Protection of Commercial Cooking Operations March 2012

Building – Fire and Smoke Alarm Systems for Part 10 Modules April 2012

Building – Fire Protection and Occupant Safety in Accordance with ABC 1997 May 2012

Building – Access Route for Fire Department Vehicles June 2012

Building – Performance Platform and Requirement of Sprinkler Deluge System June 2012

Building – Construction Compliance with ABC 2006 and Professional Involvement Compliance July 2012

Building – Requirement to provide schedules of Professional Involvement October 2012

Building – Installation of Standpipe System in Hydrocarbon Building October 2012

Building – Residential Construction of Wall Assembly and 45 minute Fire-Resistance Rating November 2012